Test of WSU Alert Notification System
This is a test of the WSU Alert System. On September 13th, 2016 at 12:05 test notifications were sent out to WSU Pullman students, faculty and staff who were signed … » More …
There are no active alerts.
This is a test of the WSU Alert System. On September 13th, 2016 at 12:05 test notifications were sent out to WSU Pullman students, faculty and staff who were signed … » More …
The WSU Office of Emergency Management will be conducting the fall semester test of the WSUAlert system on the Pullman campus Tuesday, September 13th, at 12:05 p.m. Faculty, staff and … » More …
Power to all Pullman Campus buildings has been restored. Resume operations as normal.
WSU Pullman is temporarily experiencing a power outage in sections of campus, outlined below.
0120C
CF-RAPTOR
CARVER FARM-STAUBER RAPTOR FACILITY
SPU121
0120F
CF-FISH VIVR
CARVER … » More …
Power to all Pullman Campus buildings has been restored. Resume operations as normal.
Campus operations resume back to normal. The Engineering Teaching Research Laboratory (ETRL) Building on the WSU Pullman campus and College Avenue were closed due to a HazMat incident, and are now … » More …
There has been a hazardous materials incident at Engineering Teaching Research Laboratory (ETRL). The building and College Avenue are currently closed and crews are responding. Please avoid the area until further … » More …
Avista experienced a power outage that affected power to 230 buildings on campus. Power to campus buildings is expected to be fully restored by 10:30AM. Be prepared for possible, short … » More …
There is currently an outage impacting the WSU IT server infrastructure on the Pullman campus. This outage impacts e-mail, websites & some other services. IT expects to have the outage … » More …
The contractor for the Digital Classroom construction project will be conducting an emergency response drill at 11:00 this morning. The drill will involve contractor personnel, WSU Police, and Pullman Fire … » More …